# GShips offline review-notes worksheet

Status: blank notes companion; not a decision bundle
Packet: `systems:assembly-logistics`
Packet SHA-256: `5ad32c6b71982b98771b68d69bb97954459383e15c1a1bf530b047702b4cf1e5`
Release: `public-alpha-2026-07-26-research-visuals-r14`
Source commit: `3eb036fce3d711336c8c605625895e8a2e799ab0`

This readable worksheet is for local notes only. It cannot satisfy the closed
decision-bundle schema and is not input to the validator. Use the fingerprinted
JSON template for any future structured decision. This worksheet appoints
nobody and records no completed review. Do not put identity documents, private
contact data, medical or accessibility records, confidential conflict evidence,
controlled material, or exploit details here. Keep notes offline until a
separately authorized private handoff exists.

## Reviewer declaration

Opaque public reviewer ID:

Public label:

Controlled scope codes:

Qualification basis:

Independence status and bounded basis:

Conflict public summary:

Compensation status and public summary:

AI assistance and human-verification statement:

Publication consent selections:


## 1. Launch, assembly, logistics & supply chains

- Record: `system:assembly-logistics`
- Record SHA-256: `0d8194a9390ffa72bdefb9f867bfdf37291f665934433320b017420954bddd7e`
- Public record: /systems/assembly-logistics
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (manufacturing-maintenance, systems-engineering)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 2. A generation ship would be the product of a mature off-Earth economy assembled, fueled, tested, and repaired in space—not a single launch from Earth.

- Record: `claim:claim-16-01`
- Record SHA-256: `48b1c703e65b57e49afa8ecb8ba48aa5ce5a5982e9fedea4f98e1c0ef3031d4e`
- Public record: /claims/claim-16-01
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, governance-law-rights, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 3. Rendezvous, docking, station assembly, refueling interfaces, life-extension vehicles, and some robotic servicing are operational or demonstrated.

- Record: `claim:claim-16-02`
- Record SHA-256: `8d360b37a89e820d3c85ef3b402548f33c2e795440c9f6e9ff3ec76fd0cd8874`
- Public record: /claims/claim-16-02
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 4. Large-structure welding, extrusion, prepared servicing interfaces, depots, and orbital logistics are active development areas.

- Record: `claim:claim-16-03`
- Record SHA-256: `f4942ba1e8fb48dc1d6ff44685eee6e150d172ef4f67774f8f289898371c41c8`
- Public record: /claims/claim-16-03
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 5. Commercial station and lunar-infrastructure programs can provide incremental customers and test environments.

- Record: `claim:claim-16-04`
- Record SHA-256: `bcea73d0accad9b9d8c7162f91e1e233433a8e138284c092a330e94d20cb1795`
- Public record: /claims/claim-16-04
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, governance-law-rights, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 6. The industrial cadence, raw material flow, workforce, insurance, regulation, and capital required for worldship construction are unbounded.

- Record: `claim:claim-16-05`
- Record SHA-256: `4168dae2a26caafc9f2d3f80c9370ee1ab27165e87a3357da92e7811d7d22d5d`
- Public record: /claims/claim-16-05
- Minimum independent approvals: 2
- Required scope groups: domain-method (governance-law-rights, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 7. Unprepared legacy interfaces and proprietary standards can lock an architecture to fragile vendors.

- Record: `claim:claim-16-06`
- Record SHA-256: `46fd082c2e466055f97bed2de7c7581a7d22688930c71347c3cc60c9ecd27f5c`
- Public record: /claims/claim-16-06
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 8. Full-vehicle verification, commissioning, crew loading, and abort options at unprecedented scale remain undefined.

- Record: `claim:claim-16-07`
- Record SHA-256: `8acf85f59b8f53295a2acf6efc61e19bf8277eeaa4aa7d587c9b3cc30d84e52c`
- Public record: /claims/claim-16-07
- Minimum independent approvals: 2
- Required scope groups: domain-method (governance-law-rights, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 9. Prepared interfaces, modular serviceability, logistics optimization, and supply assurance reduce waste in aerospace and remote industry.

- Record: `claim:claim-16-08`
- Record SHA-256: `b440a5e2a17f65a2e2b8f866d8cc67151e0ff01d5d6be360f432d6ee841d3061`
- Public record: /claims/claim-16-08
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 10. Reusable transport and orbital infrastructure expand scientific and commercial access to space.

- Record: `claim:claim-16-09`
- Record SHA-256: `d2efb985f62736647c77c7cd34959b59ae70ca0c8f92074d22ef586411b97aad`
- Public record: /claims/claim-16-09
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 11. Require nonexclusive interfaces, multiple suppliers, transparent logistics assumptions, staged assembly demonstrations, and a complete commissioning plan.

- Record: `claim:claim-16-10`
- Record SHA-256: `e64bdb15bc5931d9d49f4e55b1e2ff305175d78535d9c6e7169b31e7daf135c8`
- Public record: /claims/claim-16-10
- Minimum independent approvals: 2
- Required scope groups: domain-method (defensive-cyber-safety, dual-use-risk, governance-law-rights, manufacturing-maintenance, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 12. International Docking System Standard Interface Definition Document, Revision F

- Record: `claim-source:src-c1517-idss-revision-f`
- Record SHA-256: `fdef5ad17f7c04d5be00e5e288c05a0776c911d853f39ad9657dbbed9d5d3290`
- Public record: https://www.internationaldockingstandard.com/index.html
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 13. Commercial Crew Program Overview

- Record: `claim-source:src-c1517-nasa-commercial-crew`
- Record SHA-256: `39b676ab2c79d8fb500fbc21fe64e80768c043a05edd7bbf614c81575572e1c0`
- Public record: https://www.nasa.gov/humans-in-space/commercial-space/commercial-crew-program/commercial-crew-program-overview/
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 14. Commercial Space Stations in Low Earth Orbit

- Record: `claim-source:src-c1517-nasa-commercial-stations`
- Record SHA-256: `503a1552ab4de7d44312894e6b509dfce6cf7704d161ddd1568ae2187542d7b5`
- Public record: https://www.nasa.gov/humans-in-space/commercial-space/low-earth-orbit-economy/commercial-destinations-in-low-earth-orbit/
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 15. On-orbit Servicing, Assembly, and Manufacturing 1 (OSAM-1)

- Record: `claim-source:src-c1517-nasa-osam1`
- Record SHA-256: `f24fb02b0427a690e198411c7c70eb22378b776a1058a246c3302794d4dae57f`
- Public record: https://www.nasa.gov/mission/on-orbit-servicing-assembly-and-manufacturing-1/
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 16. Robotic Refueling Mission 1 and 2

- Record: `claim-source:src-c1517-nasa-rrm`
- Record SHA-256: `e933a342db81c8c697e602052397d0b3fb19b91f1eb64c65b85245ec695fa6eb`
- Public record: https://www.nasa.gov/isam/rrm-1-2/
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 17. Moon to Mars Architecture Definition Documents

- Record: `claim-source:src-pa-nasa-moon-mars`
- Record SHA-256: `a6d6ee3a2c6a911b59805537f738347ad0b375e0860e6a2b7ebd1cedc0ab5253`
- Public record: https://www.nasa.gov/moontomarsarchitecture-architecturedefinitiondocuments/
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:

