# GShips offline review-notes worksheet

Status: blank notes companion; not a decision bundle
Packet: `systems:mission-architecture`
Packet SHA-256: `d7daa815f5fc0711f24c36783e9d89911d531459112453391959fc9f0c0167ba`
Release: `public-alpha-2026-07-26-research-visuals-r14`
Source commit: `3eb036fce3d711336c8c605625895e8a2e799ab0`

This readable worksheet is for local notes only. It cannot satisfy the closed
decision-bundle schema and is not input to the validator. Use the fingerprinted
JSON template for any future structured decision. This worksheet appoints
nobody and records no completed review. Do not put identity documents, private
contact data, medical or accessibility records, confidential conflict evidence,
controlled material, or exploit details here. Keep notes offline until a
separately authorized private handoff exists.

## Reviewer declaration

Opaque public reviewer ID:

Public label:

Controlled scope codes:

Qualification basis:

Independence status and bounded basis:

Conflict public summary:

Compensation status and public summary:

AI assistance and human-verification statement:

Publication consent selections:


## 1. Mission architecture & requirements

- Record: `system:mission-architecture`
- Record SHA-256: `9cffe2c03337cdf1fe89b87afe2e8397f2e5fbc2704b8dbe4bc9d7691469b4e0`
- Public record: /systems/mission-architecture
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (mission-physics, systems-engineering)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 2. A generation ship is a civilization-scale system of systems; propulsion cannot be evaluated independently from population, maintenance, ecology, governance, arrival, and the possibility of not going.

- Record: `claim:claim-01-01`
- Record SHA-256: `b27bd54ad0555e3ee263911cd61951c321afc73de5abf2b31cfc9c626fb9e880`
- Public record: /claims/claim-01-01
- Minimum independent approvals: 2
- Required scope groups: domain-method (governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 3. Daedalus and Longshot are uncrewed interstellar probe studies; HERITAGE is a demographic simulation; Project Hyperion is a 2025 generation-ship design competition. Each exposes a different bounded trade, and none is a validated integrated mission.

- Record: `claim:claim-01-02`
- Record SHA-256: `07ec662c85a9e07b8e8bb0ffc53b6e9f8b435745cb01e081eda141eebbb7ab12`
- Public record: /claims/claim-01-02
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (affected-public-rights, mission-physics, systems-engineering)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 4. NASA systems-engineering practice supplies mature methods for requirements, interfaces, verification, risk, and lifecycle decisions.

- Record: `claim:claim-01-03`
- Record SHA-256: `85b52180fa56eaa803b56e23752307e2c72fd6a2d8301e44635205338aef19d1`
- Public record: /claims/claim-01-03
- Minimum independent approvals: 2
- Required scope groups: domain-method (governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 5. No accepted reference architecture joins technical, biological, institutional, legal, and intergenerational requirements for a crewed stellar mission.

- Record: `claim:claim-01-04`
- Record SHA-256: `92994a6ff52eb8c44e579c57b07d399a1495c34e311be2c14334bf26784d0666`
- Public record: /claims/claim-01-04
- Minimum independent approvals: 2
- Required scope groups: domain-method (governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 6. The destination, cruise speed, population, industrial closure, mission duration, and arrival strategy remain architecture-driving unknowns.

- Record: `claim:claim-01-05`
- Record SHA-256: `98a92c48ed1cde6c9f6f552b40738cd84d466aa04675745e7fc9dbc829f06a7d`
- Public record: /claims/claim-01-05
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (affected-public-rights, mission-physics, systems-engineering)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 7. There is no validated way to assign requirements to people who will be born generations after departure.

- Record: `claim:claim-01-06`
- Record SHA-256: `7313f6e7d109a2f850a2b9fe0504732da866b2dc0ed9ab66c3eb227861946d15`
- Public record: /claims/claim-01-06
- Minimum independent approvals: 2
- Required scope groups: domain-method (governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 8. Economic feasibility depends on a mature Solar System industrial base that does not yet exist.

- Record: `claim:claim-01-07`
- Record SHA-256: `9e05e292667ba0aa71264df3111c7a50bbc83c2ca9c4ca8bf7449eefed668e74`
- Public record: /claims/claim-01-07
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 9. Reference architectures improve coordination among remote habitats, disaster systems, research stations, and long-lived infrastructure.

- Record: `claim:claim-01-08`
- Record SHA-256: `dadc6a077df41c112c03f541795f5b0a60331bb004be86605bb39af3c6fe25e7`
- Public record: /claims/claim-01-08
- Minimum independent approvals: 2
- Required scope groups: domain-method (defensive-cyber-safety, governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 10. Open dependency models help funders compare reversible experiments instead of rewarding disconnected grand claims.

- Record: `claim:claim-01-09`
- Record SHA-256: `ffb9a14bbe9dc1e9f3e57bfc70b154c16ddea21e1d6da8dd0c265b9261cbcd58`
- Public record: /claims/claim-01-09
- Minimum independent approvals: 2
- Required scope groups: domain-method (dual-use-risk, governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 11. Do not approve an irreversible mission architecture until alternatives, arrival, braking, rights, rescue limits, and whole-lifecycle maintenance have independent evidence.

- Record: `claim:claim-01-10`
- Record SHA-256: `148f439e2e396c3d97bac90eb7fdcc74dc1308b47cb56e091215b7ba800572b0`
- Public record: /claims/claim-01-10
- Minimum independent approvals: 2
- Required scope groups: domain-method (governance-law-rights, mission-physics, systems-engineering); rights-public-interest (affected-public-rights)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 12. Sendai Framework for Disaster Risk Reduction 2015–2030

- Record: `claim-source:src-gr-undrr-sendai`
- Record SHA-256: `db9ef73f3cd53d5bf08e3a0644c8780cf0e7b70c5eeda4b377530b9854b31ced`
- Public record: https://www.undrr.org/publication/sendai-framework-disaster-risk-reduction-2015-2030
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 13. In-Space Servicing, Assembly, and Manufacturing: Benefits, Challenges, and Policy Options

- Record: `claim-source:src-im-gao-isam-2025`
- Record SHA-256: `f34a4c41466659821eede3dfde4b257733374fd7d50c558c8f7d1bbb1078a8e7`
- Public record: https://www.gao.gov/products/gao-25-107555
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 14. In-Space Manufacturing Portfolio Plan

- Record: `claim-source:src-im-nasa-ism-portfolio-2025`
- Record SHA-256: `06cea319893cf8240cb44a60e3ce511ca3f41a48b46c87b9915567ef6fc29ba1`
- Public record: https://ntrs.nasa.gov/citations/20250004020
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 15. Overview of NASA ISRU Plans, Priorities, and Activities

- Record: `claim-source:src-im-nasa-isru-priorities`
- Record SHA-256: `751943e37363db62202ca505da89bdf66ce92100ad7f54d63af0c5e0618cb6fb`
- Public record: https://ntrs.nasa.gov/citations/20220007350
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 16. NASA Reliability and Maintainability Standard for Spaceflight and Support Systems

- Record: `claim-source:src-im-nasa-rm-8729`
- Record SHA-256: `1adc452418fbda7d9b7258bee174773a26d9b60c7ee5859ac78c77443cf1866d`
- Public record: https://standards.nasa.gov/node/279
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 17. British Interplanetary Society Technical Projects: Project Daedalus

- Record: `claim-source:src-mp-bis-daedalus`
- Record SHA-256: `9d848f145111709ea3875e705e79a9ed5251c93a821bf539a2718a794dac324f`
- Public record: https://www.bis-space.com/technical-projects/
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 18. Project Dragonfly: A Feasibility Study of Interstellar Travel Using Laser-Powered Light Sail Propulsion

- Record: `claim-source:src-mp-dragonfly`
- Record SHA-256: `524e64d1ba7c78b6946cb4db73a484350f61749ee00a9be7b291d9ad62782395`
- Public record: https://doi.org/10.1016/j.actaastro.2016.09.030
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 19. Gaia Early Data Release 3: The Gaia Catalogue of Nearby Stars

- Record: `claim-source:src-mp-gaia-nearby-stars`
- Record SHA-256: `bcac7474911cabcf9f5e44a4a12332f634018a979c2b545f943ec7c87862ca28`
- Public record: https://www.aanda.org/articles/aa/full_html/2021/05/aa39498-20/aa39498-20.html
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 20. HERITAGE: a Monte Carlo code to evaluate the viability of interstellar travels using a multi-generational crew

- Record: `claim-source:src-mp-heritage`
- Record SHA-256: `614aeccdbc8d40fcf21f0cc9ebb3ee7ad63c15f008688646425eb4b4d2119aad`
- Public record: https://arxiv.org/abs/1708.08649
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 21. Project Longshot: An Unmanned Probe to Alpha Centauri

- Record: `claim-source:src-mp-longshot`
- Record SHA-256: `69cb3815e691b9439a24906b7ee6b1306640ed51360e7601f570320e2e697909`
- Public record: https://ntrs.nasa.gov/citations/19890007533
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 22. NASA Systems Engineering Handbook

- Record: `claim-source:src-mp-nasa-se-handbook`
- Record SHA-256: `3337ce334909311c3ab1c604773fdcc31a01dd8e0e781d040debd3b6e33cea22`
- Public record: https://www.nasa.gov/wp-content/uploads/2018/09/nasa_systems_engineering_handbook_0.pdf
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 23. Project Hyperion Design Competition Results 2025

- Record: `claim-source:src-mp-project-hyperion`
- Record SHA-256: `3bc145b572765b3adac640460dfc09f177dd859cc91a282bbec841d662fd7905`
- Public record: https://www.projecthyperion.org/
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 24. Relativistic rocket and space flight

- Record: `claim-source:src-mp-semay-relativistic-flight`
- Record SHA-256: `a76854df17f07fc94e424e9f2e5502d5f194f9a3a27a3682bf91bf8bb72eeb16`
- Public record: https://doi.org/10.1016/j.actaastro.2006.03.007
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 25. Microgrids for Resiliency

- Record: `claim-source:src-pa-doe-microgrids`
- Record SHA-256: `74396b6f9d8fb2430311685ac2173717c0b967aaa92d8a1306d94c3ecb7f3f5d`
- Public record: https://www.energy.gov/sites/default/files/2024-01/28-01-2021_doe-voe-microgrids-for-resiliency-report-2.pdf
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 26. World Ships: Feasibility and Rationale

- Record: `claim-source:src-po-hein-world-ships`
- Record SHA-256: `7fd7d8cf4182911c9600b43dee89dcf970b0eaa290b69f12500273114297c28b`
- Public record: https://arxiv.org/abs/2005.04100
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 27. Prospects for Interstellar Propulsion

- Record: `claim-source:src-po-nasa-interstellar-propulsion`
- Record SHA-256: `fea9412feeb0fd996832716565716c3ca7ee80b57958dfa7032b1840679eb9f5`
- Public record: https://ntrs.nasa.gov/api/citations/20200000759/downloads/20200000759.pdf
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 28. Assessing Potential Propulsion Breakthroughs

- Record: `claim-source:src-po-nasa-propulsion-breakthroughs`
- Record SHA-256: `5a4c16222976a95576e21ba5c8633865a26f4be58cad2698eb13431f77b318b0`
- Public record: https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20060000022.pdf
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 29. NASA Risk-Informed Decision Making Handbook

- Record: `claim-source:src-po-nasa-ridm`
- Record SHA-256: `901b35585226d759b25047071feca554ca535c8ffd0335b3667814f4b7fe116a`
- Public record: https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20100021361.pdf
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 30. OECD Guidelines for Citizen Participation Processes

- Record: `claim-source:src-po-oecd-citizen-participation`
- Record SHA-256: `2fcb0a0d2c7f8211e53ec1f000ef94f2486f1a2b18e16a39511ce3c25b2130c2`
- Public record: https://www.oecd.org/en/publications/2022/09/oecd-guidelines-for-citizen-participation-processes_63b34541.html
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 31. Declaration on the Responsibilities of the Present Generations Towards Future Generations

- Record: `claim-source:src-po-unesco-future-generations`
- Record SHA-256: `1abd40816de69f992c66c209f2302d950336c9372d5f2685773b47715b00ef2b`
- Public record: https://www.unesco.org/en/legal-affairs/declaration-responsibilities-present-generations-towards-future-generations
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:


## 32. Convention on the Rights of the Child

- Record: `claim-source:src-po-unicef-crc`
- Record SHA-256: `5bdae8a7100ea191caad9293c738bb6cd277320ab47e1142ae827954b50853fd`
- Public record: https://www.unicef.org/child-rights-convention/convention-text
- Minimum independent approvals: 1
- Required scope groups: bounded-competence (information-science)

Disposition: [ ] approve [ ] revise [ ] contest [ ] reject [ ] recuse

Bounded scope:

Rationale:

Evidence source ID, exact locator, and finding:

Proposed correction or recusal reason:

What would change this decision:

