Control Architecture for the Deep Space Mission System (DSMS)
As NASA moves int an era of flying more missions at much lower cost and shorter development duration, the Deep Space Mission System (DSMS) has been redesigned to provide services to approximately 50 missions during the next 10 years.
Selection note: Curated as historical control-architecture context for redesigning a Deep Space Mission System to serve roughly fifty lower-cost, shorter-development missions.
Evidence boundary: Only NTRS metadata and an abstract are available here; architecture details, operational outcomes, and present applicability were not validated. It is historical scale-up context, not claim evidence.
Stable record
ntrs-20060033036
Topic
mission-architecture
Type
Conference Paper
Publisher
Jet Propulsion Laboratory
Authors
Tai, W.; Shames, P.; Schell, R.
Year
2000
Editorial state
metadata curated editorial draft
Reviewer
GShips Project editorial synthesis
Official link checked
2026-07-25
Source-supplied abstract
As NASA moves int an era of flying more missions at much lower cost and shorter development duration, the Deep Space Mission System (DSMS) has been redesigned to provide services to approximately 50 missions during the next 10 years.
Abstract text has not been adopted as a GShips conclusion.
What would change this record?
A newer or corrected version, a retraction, a verified duplicate, a material topic mismatch, a changed access state, or claim-level review would trigger a dated editorial update.
Only NTRS metadata and an abstract are available here; architecture details, operational outcomes, and present applicability were not validated. It is historical scale-up context, not claim evidence.
Source-supplied titles, abstracts, authors, and dates may require correction against the canonical full text.
What would change this page?
A newer or corrected version, retraction, verified duplicate, material topic mismatch, changed access state, or claim-level assessment would change this record.
People, review, and conflicts
Prepared by
GShips Project
Editorial status
metadata-curated-editorial-draft
Editorial reviewer
GShips Project editorial synthesis
Last editorial review
No editorial-review date recorded
Independent review
pending
Independent reviewer
No independent reviewer assigned
Last independent review
No independent-review date exists
Last content edit
Not recorded separately
Official source or link verified
2026-07-25
Declared conflicts
The maintainer intends to explore a commercial venture based on some GShips work. No entity, outside funding, customer, sponsor, or indexed-organization relationship currently exists.