America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing
The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's nex
Selection note: Curated for its transition from design to manufacturing of the multi-element SLS core stage, including avionics, propulsion, pressure vessels, structures, production facilities, safety, and affordability framing.
Evidence boundary: NTRS lists open full text, but curation used the abstract and metadata rather than auditing manufacturing outcomes or program claims. Launch-stage experience is precursor context, not proof of worldship-scale production.
Stable record
ntrs-20140010449
Topic
mission-architecture
Type
Abstract
Publisher
Marshall Space Flight Center
Authors
Birkenstock, Benjamin; Kauer, Roy
Year
2014
Editorial state
metadata curated editorial draft
Reviewer
GShips Project editorial synthesis
Official link checked
2026-07-25
Source-supplied abstract
The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.
Abstract text has not been adopted as a GShips conclusion.
What would change this record?
A newer or corrected version, a retraction, a verified duplicate, a material topic mismatch, a changed access state, or claim-level review would trigger a dated editorial update.
NTRS lists open full text, but curation used the abstract and metadata rather than auditing manufacturing outcomes or program claims. Launch-stage experience is precursor context, not proof of worldship-scale production.
Source-supplied titles, abstracts, authors, and dates may require correction against the canonical full text.
What would change this page?
A newer or corrected version, retraction, verified duplicate, material topic mismatch, changed access state, or claim-level assessment would change this record.
People, review, and conflicts
Prepared by
GShips Project
Editorial status
metadata-curated-editorial-draft
Editorial reviewer
GShips Project editorial synthesis
Last editorial review
No editorial-review date recorded
Independent review
pending
Independent reviewer
No independent reviewer assigned
Last independent review
No independent-review date exists
Last content edit
Not recorded separately
Official source or link verified
2026-07-25
Declared conflicts
The maintainer intends to explore a commercial venture based on some GShips work. No entity, outside funding, customer, sponsor, or indexed-organization relationship currently exists.