Selection note: Curated because this 2022 conference paper from Johnson Space Center specifically covers “NASA Envisioned Future Priorities for In Situ Resource Utilization”; its abstract describes A major objective of the United States National Aeronautics and Space Administration’s Artemis program is to create a sustainable human lunar exploration program through… This materially informs GShips manufacturing and ISRU.

Evidence boundary: NTRS lists open full text, but this pass assessed catalog metadata and abstract rather than independently validating the document. Inclusion is contextual discovery support, not automatic evidence for a GShips claim.

Stable record
ntrs-20220012448
Topic
manufacturing-isru
Type
Conference Paper
Publisher
Johnson Space Center
Authors
Gerald. B. Sanders; Julie E. Kleinhenz
Year
2022
Editorial state
metadata curated editorial draft
Reviewer
GShips Project editorial synthesis
Official link checked
2026-07-25

Source-supplied abstract

A major objective of the United States National Aeronautics and Space Administration’s Artemis program is to create a sustainable human lunar exploration program through the establishment of lunar infrastructure and commercial space operations. A key aspect in achieving this objective is characterizing the resources that exist on the Moon and Mars, and learning how to utilize them to create products for crew, power, transportation, and infrastructure growth. Commonly known as In Situ Resource Utilization (ISRU), the ability to make products from local materials instead of bringing everything from Earth has the potential to significantly reduce mission costs, mass, risks, and dependency on Earth. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) established a strategic framework, called the Strategic Technology Architecture Roundtable (STAR) process, to coordinate development of critical capabilities around four major Thrusts (Go, Land, Live, and Explore). To guide and drive the development of critical mission capabilities, the STAR process involves establishing a ‘grand vision’ known as an Envisioned Future for each of these capabilities. For ISRU, the Envisioned Future is “Scalable ISRU production/utilization capabilities including sustainable commodities on the lunar and Mars Surface”. This paper will discuss the STAR process, and the strategic plan and near-term priorities for achieving the ISRU Envisioned Future.

Abstract text has not been adopted as a GShips conclusion.

What would change this record?

A newer or corrected version, a retraction, a verified duplicate, a material topic mismatch, a changed access state, or claim-level review would trigger a dated editorial update.

Open the source record (opens external site in a new tab)

Metadata-curated context; independent domain and claim review pending · Last edited 2026-07-25 · Suggest a correction

Accountability record

How to inspect this page

Scope: Atlas resource ntrs-20220012448

Page citations and accountability links

Assumptions and limits

  • NTRS lists open full text, but this pass assessed catalog metadata and abstract rather than independently validating the document. Inclusion is contextual discovery support, not automatic evidence for a GShips claim.
  • Source-supplied titles, abstracts, authors, and dates may require correction against the canonical full text.

What would change this page?

A newer or corrected version, retraction, verified duplicate, material topic mismatch, changed access state, or claim-level assessment would change this record.

People, review, and conflicts

Prepared by
GShips Project
Editorial status
metadata-curated-editorial-draft
Editorial reviewer
GShips Project editorial synthesis
Last editorial review
No editorial-review date recorded
Independent review
pending
Independent reviewer
No independent reviewer assigned
Last independent review
No independent-review date exists
Last content edit
Not recorded separately
Official source or link verified
2026-07-25

Declared conflicts

  • The maintainer intends to explore a commercial venture based on some GShips work. No entity, outside funding, customer, sponsor, or indexed-organization relationship currently exists.

Suggest a correction to this page