Selection note: Curated because this 2024 reprint (version printed in journal) from International Society for Optical Engineering specifically covers “Lessons Learned From Systems Engineering on the James Webb Space Telescope”; its abstract describes The James Webb Space Telescope is NASA’s flagship mission and successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic… This materially informs GShips institutions and workforce.

Evidence boundary: NTRS lists open full text, but this pass assessed catalog metadata and abstract rather than independently validating the document. Inclusion is contextual discovery support, not automatic evidence for a GShips claim.

Stable record
ntrs-20250005920
Topic
institutions-workforce
Type
Reprint (Version printed in journal)
Publisher
International Society for Optical Engineering
Authors
Michael Menzel; Keith Parrish; Lee Feinberg; Paul Geithner; Julie Van Campen; Michael McElwain; Sandra Irish
Year
2024
Editorial state
metadata curated editorial draft
Reviewer
GShips Project editorial synthesis
Official link checked
2026-07-25

Source-supplied abstract

The James Webb Space Telescope is NASA’s flagship mission and successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable optical telescope element with a payload of four science instruments assembled into an integrated science instrument module that provide imagery and spectroscopy in the near infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28 μm. JWST was successfully launched on December 25, 2021, aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed by January 8, 2022. The observatory performed all mid-course correction maneuvers and achieved its operational mission orbit around the Sun-Earth second Lagrange Point. All commissioning and calibration activities have been completed and JWST has begun its science mission. Its present performance meets or out-performs all requirements. Launching over 20 years after its mission concept review, the JWST Observatory is a first and only of its kind of facility. This program faced many unique challenges that were not only technical in nature but also organizational and managerial. We describe the challenges faced by the JWST systems engineering team, the way the team addressed them, and make recommendations for focus areas of future flagship missions, which will likely face similar challenges. It will not explicitly address the cost challenges of the mission. We first describe the mission and its over-arching challenges. We then describe the tailoring of systems engineering processes and methods used to address these challenges and effectiveness. The events, tasks, issues, and their resolutions and the resulting specific lessons learned from the project are discussed with the over-arching recommendations for future flagship missions that derive from these lessons.

Abstract text has not been adopted as a GShips conclusion.

What would change this record?

A newer or corrected version, a retraction, a verified duplicate, a material topic mismatch, a changed access state, or claim-level review would trigger a dated editorial update.

Open the source record (opens external site in a new tab)

Metadata-curated context; independent domain and claim review pending · Last edited 2026-07-25 · Suggest a correction

Accountability record

How to inspect this page

Scope: Atlas resource ntrs-20250005920

Page citations and accountability links

Assumptions and limits

  • NTRS lists open full text, but this pass assessed catalog metadata and abstract rather than independently validating the document. Inclusion is contextual discovery support, not automatic evidence for a GShips claim.
  • Source-supplied titles, abstracts, authors, and dates may require correction against the canonical full text.

What would change this page?

A newer or corrected version, retraction, verified duplicate, material topic mismatch, changed access state, or claim-level assessment would change this record.

People, review, and conflicts

Prepared by
GShips Project
Editorial status
metadata-curated-editorial-draft
Editorial reviewer
GShips Project editorial synthesis
Last editorial review
No editorial-review date recorded
Independent review
pending
Independent reviewer
No independent reviewer assigned
Last independent review
No independent-review date exists
Last content edit
Not recorded separately
Official source or link verified
2026-07-25

Declared conflicts

  • The maintainer intends to explore a commercial venture based on some GShips work. No entity, outside funding, customer, sponsor, or indexed-organization relationship currently exists.

Suggest a correction to this page