Technical collaboration lead from Oak Ridge National Laboratory; eligibility, timing, and fit require current official verification.
No application or relationship exists. This record does not establish eligibility, availability, funding, recommendation, provider interest, or authorization to apply.
Provider
Oak Ridge National Laboratory
Kind
Technical collaboration
Status
active; rolling
Timing
Rolling project development. ORNL describes DOE proposal review on a rolling cycle every two weeks after co-development, with agreement development typically taking three to four months.
Eligibility
The MDF Technical Collaboration Program is limited to industries that manufacture equipment, process materials, produce manufacturing-related software, or integrate energy systems in the United States, or would be able to do so through the collaboration.
Access notes
Projects are short-term, collaborative, and equally cost-shared with no cash exchange; each side contributes resources. Work typically runs six months to two years through a CRADA or user agreement, and international-company reviews take longer.
Official link checked
2026-07-25
Relationship
indexed only; no formal relationship
Potential fit and evidence boundary
Additive manufacturing, repair, and industrial scale-up
Evidence boundary: Official ORNL MDF Technical Collaboration page reviewed. It documents eligibility, rolling cadence, cost-share model, agreement timing, and IP outline; it does not establish GShips eligibility, project acceptance, valuation, or a relationship.
The rolling collaboration route may fit a concrete manufacturing problem after public evidence and agreement boundaries are reviewed.
Required artifact: A measured maintenance or repair bottleneck and reproducible test plan.
Action status: proposed; not undertaken
Proposed founder action—not undertaken
Defer until an incorporated, eligible U.S. manufacturing company has a concrete process, repair, feedstock, automation, or scale-up problem and can supply an equal in-kind contribution; seek authorization before contact.
Conflicts and change triggers
Conflicts: IP allocation, cost-share valuation, background rights, export control, publication, and national-laboratory contracting require legal and technical review.
What would change this record? Formation of an eligible manufacturer, a defined technical work package and cost share, or revised TCP terms would materially change fit.
Official ORNL MDF Technical Collaboration page reviewed. It documents eligibility, rolling cadence, cost-share model, agreement timing, and IP outline; it does not establish GShips eligibility, project acceptance, valuation, or a relationship.
Indexing and task matching do not establish eligibility, recommendation, availability, funding, provider interest, a relationship, or authorization to apply.
What would change this page?
Formation of an eligible manufacturer, a defined technical work package and cost share, or revised TCP terms would materially change fit.
IP allocation, cost-share valuation, background rights, export control, publication, and national-laboratory contracting require legal and technical review.
The maintainer intends to explore a commercial venture based on some GShips work. No entity, outside funding, customer, sponsor, or indexed-organization relationship currently exists.