Packet identity

Packet ID
organizations:entity-dlr-eden-luna
Packet SHA-256 identity
bab74e66d564de8f9ee3a837f174c009d475a9870354fb0f31c239498911c40d
Corpus SHA-256 identity
8fa944604ca189f5a9216ca59f640ad2ca20972ad512f2f4970764716782e18d
Release ID
public-alpha-2026-07-26-research-visuals-r14
Source commit
3eb036fce3d711336c8c605625895e8a2e799ab0
Frozen corpus date
2026-07-25
Primary records
1
Reference sources
1

Questions and exclusions

Required questions

  1. Required question 1 (exact ID: question-1)
    Does the official source establish the entity, current program, and bounded capability described?
  2. Required question 2 (exact ID: question-2)
    Are potential fit, risks, access, geography, and engagement boundaries current and proportionate?
  3. Required question 3 (exact ID: question-3)
    Could any wording imply partnership, endorsement, availability, procurement, authority, or affiliation that does not exist?

Explicit exclusions

  • Indexing is not endorsement, due diligence completion, outreach, procurement, or a relationship.
  • No aggregate organization score or sponsor-purchased ranking is permitted.

Requested controlled scopes: ecosystem-due-diligence, information-science

Frozen-evidence decision window: 90 days from the packet freeze. Not applicable to this packet family.

Complete primary record set

Every record below has one primary packet owner. Decisions must bind to the exact record and packet fingerprints; a changed lesson body, evidence grade, citation, locator, source snapshot, requirement, policy, release, or commit expires the old packet.

  1. ecosystem-organization · entity-dlr-eden-luna

    DLR EDEN LUNA

    Record fingerprint
    576256425e3b24daa43ca02db2c5d5da2138b7d5423e92bcc6b247cf32003661
    Minimum approvals
    1
    Required scope groups
    bounded-competence: ecosystem-due-diligence
    High-consequence domains
    None under the named two-person rule
    Review state
    pending
    Published human decisions
    0
    Inspect the complete frozen review surface
    ID
    entity-dlr-eden-luna
    Legacy ID
    org-universi-015
    Slug
    dlr-eden-luna
    Name
    DLR EDEN LUNA
    Category
    University and national laboratory
    Geography
    Germany
    Relevance
    enabling
    Engagement
    Proposed only, subject to a future fit check and then-current access rules: follow published results and, if an open research mechanism exists, propose one narrowly defined reliability or data-interoperability study through DLR channels. No outreach, eligibility determination, commitment, or procurement has occurred.
    Capability
    Controlled-environment agriculture, bioregenerative life support, greenhouse robotics, remote operations, microbiome characterization, and analog training.
    Entity Kind
    government research program and analog greenhouse facility
    Link Checked At
    2026-07-25
    Relationship
    indexed only; no formal relationship
    Engagement Status
    proposed; not undertaken
    Profile Summary
    EDEN LUNA is a DLR research program converting the Antarctic-tested EDEN ISS greenhouse for integration with the DLR–ESA LUNA analog facility, focusing on nutrient cycling, energy efficiency, robotics, microbiomes, fault detection, and closed bioregenerative support.
    Potential Fit
    Could provide unusually relevant lessons for crop operations, autonomy, crew workload, urine-derived nutrients, microbial monitoring, and fault recovery in a bounded analog.
    Risks
    1. The official project duration is currently bounded and future extension is not guaranteed.
    2. A lunar analog with periodic external support does not reproduce generation-ship isolation or ecological closure.
    3. Biological performance, food adequacy, contamination, and energy balances require independent full-system review.
    Evidence Boundary
    Official-link review: the official DLR project pages were reachable and give current 2024–2026 scope, facility integration, technical focus, and planned operations. Public descriptions, performance, maturity, access, procurement, and current availability were not independently verified; independent review pending.
    Conflicts
    Conflicts were not assessed beyond publisher disclosure in this official-link review; financial, contracting, leadership, and institutional conflicts were not independently investigated.
    What Would Change
    Published integrated-loop data, anomaly logs, mass and energy balances, confirmed post-2026 operations, and external research rules would change the assessment.
Equivalent record table for this packet
RecordSubjectFingerprintApprovalsScope groups
ecosystem-organization:entity-dlr-eden-luna DLR EDEN LUNA 576256425e3b24daa43ca02db2c5d5da2138b7d5423e92bcc6b247cf32003661 1 bounded-competence: ecosystem-due-diligence

Frozen source snapshots

Source inclusion does not determine the disposition. Reviewers must inspect the cited locator and relation, note inaccessible material, and identify stronger or conflicting evidence.

Sources, verification dates, scope notes, and exact fingerprints
Source IDSourceCheckedScope boundaryFingerprint
official-ecosystem-organization-entity-dlr-eden-luna DLR EDEN LUNA (opens external site in a new tab) 2026-07-25 Official-link review: the official DLR project pages were reachable and give current 2024–2026 scope, facility integration, technical focus, and planned operations. Public descriptions, performance, maturity, access, procurement, and current availability were not independently verified; independent review pending. e975af8d4a860066302737d632b14d6e9f05315ce923ecff72a71e73aa208d96

Offline packet and worksheet

Downloads contain no reviewer contact details. Downloading does not create an account or store a review response in the GShips application. Ordinary provider request or analytics logs may record the download request. Work locally: the public site has no review account, upload endpoint, or decision-submission API.

Frozen packet · JSON

14.1 KB · packet identity bab74e66d564de8f…

Download packet

Blank decision worksheet · JSON

3.0 KB · template identity 144c4cf2abcda183…

Download blank JSON

Review-notes worksheet · Markdown

Readable notes companion only—not a decision-bundle equivalent. Use the closed JSON template for structural validation.

Download notes worksheet

Do not paste a completed decision, identity documents, private contact data, confidential conflict evidence, medical information, controlled material, or exploit details into a public form. Until a separately authorized private handoff exists, retain the completed worksheet locally.

Packet schema · JSON · Decision-bundle schema · JSON

Validate offline

Use Node.js 22.13.0 or later. Keep the packet, worksheet, completed decision, and all six kit files together in a local directory.

  1. Download the six kit files below. Complete a copy of the JSON template offline and preserve its templateFingerprint.
  2. Finalize a separate output file.
    node finalize-review-decision.mjs \
      --input DRAFT.json \
      --output COMPLETED.json

    This marks the copy complete and calculates an unkeyed canonical bundle fingerprint. A fingerprint detects changes; it is not a reviewer signature.

  3. Validate the packet and completed copy.
    node check-review-decisions.mjs \
      --packet PACKET.json \
      --decision COMPLETED.json

    Add another --decision for each independent reviewer.

  4. Interpret the result narrowly. A zero exit proves structural consistency only. Neither command appoints or qualifies a reviewer, establishes independence, accepts a decision, or authorizes publication.

Completion criteria

Every primary record must receive the required number of valid, current-fingerprint approvals; every complementary scope group and required domain must be covered; any unresolved revise, contest, or reject disposition blocks publication.

Named medical, reproductive, nuclear, radiation, cybersecurity, governance, and dual-use conclusions require two distinct qualified independent humans covering complementary domain-method and rights/public-interest scopes.

  • Reviewer identity, qualification, independence, conflicts, and compensation must be assessed by accountable human governance; local validation can only report structural validity.
  • Approve, revise, contest, reject, and recuse remain visible. A negative finding cannot be hidden by an aggregate approval percentage.
  • Revision creates a new record and packet fingerprint. Prior approvals do not carry forward automatically.
  • AI may assist with clerical comparison but cannot count as an independent reviewer, identity attestor, appeal authority, or second person.

Prepared review packet · 0 published human decisions · Independent review pending · Suggest a correction

Accountability record

How to inspect this page

Scope: Prepared review packet organizations:entity-dlr-eden-luna · bab74e66d564de8f9ee3a837f174c009d475a9870354fb0f31c239498911c40d

Page citations and accountability links

  • Exact frozen packet
    Complete packet payload; SHA-256 bab74e66d564de8f9ee3a837f174c009d475a9870354fb0f31c239498911c40d · fingerprint-bound review artifact
  • Blank closed decision template
    Offline structured-decision starting point · unsubmitted local artifact
  • Review-notes worksheet
    Human-readable notes companion; not validator input · offline notes aid
  • Review corpus index
    Corpus SHA-256 8fa944604ca189f5a9216ca59f640ad2ca20972ad512f2f4970764716782e18d · release and ownership index

Assumptions and limits

  • The exact packet, record, source, policy, release, and source-commit fingerprints bound this prepared page; human review has not started.
  • Downloading, local structural validation, or completing notes does not appoint or qualify a reviewer, establish independence, accept a decision, authorize publication, or create a relationship.

What would change this page?

Staffed governance, appointed qualified reviewers, completed record-level decisions, published conflicts, minority findings, corrections, or changed review policy would change this page.

People, review, and conflicts

Prepared by
GShips Project
Editorial status
public-alpha accountability pass
Editorial reviewer
GShips Project AI-assisted editorial synthesis
Last editorial review
2026-07-26
Independent review
pending
Independent reviewer
No independent reviewer assigned
Last independent review
No independent-review date exists
Last content edit
2026-07-25

Declared conflicts

  • The maintainer intends to explore a commercial venture based on some GShips work. No entity, outside funding, customer, sponsor, or indexed-organization relationship currently exists.

Suggest a correction to this page