Packet identity

Packet ID
organizations:entity-zeno-power
Packet SHA-256 identity
e632925e892b0cef82610359542d1694160ba285b3605196390bc40dd6ba10ef
Corpus SHA-256 identity
8fa944604ca189f5a9216ca59f640ad2ca20972ad512f2f4970764716782e18d
Release ID
public-alpha-2026-07-26-research-visuals-r14
Source commit
3eb036fce3d711336c8c605625895e8a2e799ab0
Frozen corpus date
2026-07-25
Primary records
1
Reference sources
1

Questions and exclusions

Required questions

  1. Required question 1 (exact ID: question-1)
    Does the official source establish the entity, current program, and bounded capability described?
  2. Required question 2 (exact ID: question-2)
    Are potential fit, risks, access, geography, and engagement boundaries current and proportionate?
  3. Required question 3 (exact ID: question-3)
    Could any wording imply partnership, endorsement, availability, procurement, authority, or affiliation that does not exist?

Explicit exclusions

  • Indexing is not endorsement, due diligence completion, outreach, procurement, or a relationship.
  • No aggregate organization score or sponsor-purchased ranking is permitted.

Requested controlled scopes: ecosystem-due-diligence, information-science

Frozen-evidence decision window: 90 days from the packet freeze. Not applicable to this packet family.

Complete primary record set

Every record below has one primary packet owner. Decisions must bind to the exact record and packet fingerprints; a changed lesson body, evidence grade, citation, locator, source snapshot, requirement, policy, release, or commit expires the old packet.

  1. ecosystem-organization · entity-zeno-power

    Zeno Power

    Record fingerprint
    4bc509e088af2e6bbb5bbf484c248a0304f8421ba002f13b0600c4be1876c4a5
    Minimum approvals
    1
    Required scope groups
    bounded-competence: ecosystem-due-diligence
    High-consequence domains
    None under the named two-person rule
    Review state
    pending
    Published human decisions
    0
    Inspect the complete frozen review surface
    ID
    entity-zeno-power
    Legacy ID
    org-company--045
    Slug
    zeno-power
    Name
    Zeno Power
    Category
    Company and applied technology
    Geography
    Washington, DC, United States
    Relevance
    enabling
    Engagement
    Proposed only, subject to a future fit check and all nuclear, launch, export, safeguards, security, and procurement rules: evaluate only a defined civil precursor need after non-nuclear alternatives and lifecycle risks are compared. No outreach, commitment, procurement, or nuclear activity has occurred.
    Capability
    Radioisotope power-system design, strontium-90 heat-source integration, power conversion, remote-energy applications, nuclear safety work, and government program execution.
    Entity Kind
    private radioisotope power-system company
    Link Checked At
    2026-07-25
    Relationship
    indexed only; no formal relationship
    Engagement Status
    proposed; not undertaken
    Profile Summary
    Zeno Power develops compact radioisotope power systems, described as nuclear batteries, using strontium-90 heat sources for long-duration power in remote terrestrial, maritime, lunar, and space applications. The systems are under development and subject to nuclear material, launch, safety, and government controls.
    Potential Fit
    Could inform low-power, long-life backup energy for remote sensors, precursor probes, dark environments, and safety systems where solar or maintenance access is inadequate.
    Risks
    1. Radioisotope systems carry launch-accident, contamination, security, safeguards, disposal, and intergenerational stewardship risks.
    2. Fuel availability, specific power, conversion lifetime, licensing, and program schedule may constrain use.
    3. Government and defense-linked applications create export-control, dual-use, and controlled-information boundaries.
    Evidence Boundary
    Official-link review: the company site was reachable and describes strontium-90 radioisotope power systems and target applications. Operational readiness, qualification, fuel access, safety cases, availability, costs, complete lifecycle impacts, and mission fit were not independently verified; independent review pending.
    Conflicts
    The company has a commercial interest in radioisotope power; government awards, fuel suppliers, customers, investors, and regulatory interests were not independently investigated.
    What Would Change
    Independent safety and qualification evidence, demonstrated long-duration operation, a lawful fuel and disposal pathway, transparent lifecycle analysis, and a need unmet by safer alternatives would be required.
Equivalent record table for this packet
RecordSubjectFingerprintApprovalsScope groups
ecosystem-organization:entity-zeno-power Zeno Power 4bc509e088af2e6bbb5bbf484c248a0304f8421ba002f13b0600c4be1876c4a5 1 bounded-competence: ecosystem-due-diligence

Frozen source snapshots

Source inclusion does not determine the disposition. Reviewers must inspect the cited locator and relation, note inaccessible material, and identify stronger or conflicting evidence.

Sources, verification dates, scope notes, and exact fingerprints
Source IDSourceCheckedScope boundaryFingerprint
official-ecosystem-organization-entity-zeno-power Zeno Power (opens external site in a new tab) 2026-07-25 Official-link review: the company site was reachable and describes strontium-90 radioisotope power systems and target applications. Operational readiness, qualification, fuel access, safety cases, availability, costs, complete lifecycle impacts, and mission fit were not independently verified; independent review pending. 79d1a30c529ca9277e534b29f7791f5147ce487212a8f3b94cc6eafc905bac87

Offline packet and worksheet

Downloads contain no reviewer contact details. Downloading does not create an account or store a review response in the GShips application. Ordinary provider request or analytics logs may record the download request. Work locally: the public site has no review account, upload endpoint, or decision-submission API.

Frozen packet · JSON

14.1 KB · packet identity e632925e892b0cef…

Download packet

Blank decision worksheet · JSON

3.0 KB · template identity 8f89a01adb7f2a42…

Download blank JSON

Review-notes worksheet · Markdown

Readable notes companion only—not a decision-bundle equivalent. Use the closed JSON template for structural validation.

Download notes worksheet

Do not paste a completed decision, identity documents, private contact data, confidential conflict evidence, medical information, controlled material, or exploit details into a public form. Until a separately authorized private handoff exists, retain the completed worksheet locally.

Packet schema · JSON · Decision-bundle schema · JSON

Validate offline

Use Node.js 22.13.0 or later. Keep the packet, worksheet, completed decision, and all six kit files together in a local directory.

  1. Download the six kit files below. Complete a copy of the JSON template offline and preserve its templateFingerprint.
  2. Finalize a separate output file.
    node finalize-review-decision.mjs \
      --input DRAFT.json \
      --output COMPLETED.json

    This marks the copy complete and calculates an unkeyed canonical bundle fingerprint. A fingerprint detects changes; it is not a reviewer signature.

  3. Validate the packet and completed copy.
    node check-review-decisions.mjs \
      --packet PACKET.json \
      --decision COMPLETED.json

    Add another --decision for each independent reviewer.

  4. Interpret the result narrowly. A zero exit proves structural consistency only. Neither command appoints or qualifies a reviewer, establishes independence, accepts a decision, or authorizes publication.

Completion criteria

Every primary record must receive the required number of valid, current-fingerprint approvals; every complementary scope group and required domain must be covered; any unresolved revise, contest, or reject disposition blocks publication.

Named medical, reproductive, nuclear, radiation, cybersecurity, governance, and dual-use conclusions require two distinct qualified independent humans covering complementary domain-method and rights/public-interest scopes.

  • Reviewer identity, qualification, independence, conflicts, and compensation must be assessed by accountable human governance; local validation can only report structural validity.
  • Approve, revise, contest, reject, and recuse remain visible. A negative finding cannot be hidden by an aggregate approval percentage.
  • Revision creates a new record and packet fingerprint. Prior approvals do not carry forward automatically.
  • AI may assist with clerical comparison but cannot count as an independent reviewer, identity attestor, appeal authority, or second person.

Prepared review packet · 0 published human decisions · Independent review pending · Suggest a correction

Accountability record

How to inspect this page

Scope: Prepared review packet organizations:entity-zeno-power · e632925e892b0cef82610359542d1694160ba285b3605196390bc40dd6ba10ef

Page citations and accountability links

  • Exact frozen packet
    Complete packet payload; SHA-256 e632925e892b0cef82610359542d1694160ba285b3605196390bc40dd6ba10ef · fingerprint-bound review artifact
  • Blank closed decision template
    Offline structured-decision starting point · unsubmitted local artifact
  • Review-notes worksheet
    Human-readable notes companion; not validator input · offline notes aid
  • Review corpus index
    Corpus SHA-256 8fa944604ca189f5a9216ca59f640ad2ca20972ad512f2f4970764716782e18d · release and ownership index

Assumptions and limits

  • The exact packet, record, source, policy, release, and source-commit fingerprints bound this prepared page; human review has not started.
  • Downloading, local structural validation, or completing notes does not appoint or qualify a reviewer, establish independence, accept a decision, authorize publication, or create a relationship.

What would change this page?

Staffed governance, appointed qualified reviewers, completed record-level decisions, published conflicts, minority findings, corrections, or changed review policy would change this page.

People, review, and conflicts

Prepared by
GShips Project
Editorial status
public-alpha accountability pass
Editorial reviewer
GShips Project AI-assisted editorial synthesis
Last editorial review
2026-07-26
Independent review
pending
Independent reviewer
No independent reviewer assigned
Last independent review
No independent-review date exists
Last content edit
2026-07-25

Declared conflicts

  • The maintainer intends to explore a commercial venture based on some GShips work. No entity, outside funding, customer, sponsor, or indexed-organization relationship currently exists.

Suggest a correction to this page